WebbDetermine that the class of reinforced concrete pipe and method of backfill selected by the contractor meet these details. Refer to Section 4-19, “Earthwork,” of this manual for … WebbPART 1 - GENERAL. 1.01 SECTIONINCLUDES. A. TrenchExcavation for Pipe Systems. B. TrenchFoundation Stabilization. C. PipeBedding and Backfill. 1.02 DESCRIPTIONOF …
EXISTING AC EDGE - City of Napa
WebbProvisions that comprise this specification: Section 02718 – Installation of Water Pipeline. Section 15057 – Ductile Iron Water Pipe & Fittings. Section 15058 – Cast Iron Fittings. Section 15059 – Welded Steel Fittings. Section 15061 – Steel Cylinder Water Pipe. Section 15064 – Plastic (PVC) Water Pipe & Fittings. WebbTRENCH DETAILS The basic trench details are indicated on Standard Drawings E 715-BKFL-01 through E 715-BKFL-08. ROCK If rock is encountered during excavation for the pipe, the rock is required to be removed 8 in. below the bottom of the pipe. B borrow is used as backfill to bring the pipe to the proper flowline. BEDDING DETAILS secu hemby ln greenville nc
E0-1181:GENERAL SPECIFICATION FOR BACKFILLING OF TRENCH …
WebbBackfill Placement. The backfill material that lies within 300mm of the pipe crown should be free from particles stones exceeding 40mm diameter. Heavy compaction should not … http://www.transportation.wv.gov/highways/engineering/Documents/revisedstandarddetails/TYPE%20A-B-C%20and%20D%20TRENCH%2012_09_11.pdf WebbThis work shall consist of installing pipe culverts, endwalls, box culverts, precast concrete and metal arches , storm drains ... Excavation and backfill operations shall be performed in accordance with the requirements of ... When construction appears to be in close proximity to existing utilities, the trench (es ... secu hanover md